UAB Stavaltech: Design and construction work completed in 2023!

In 2023, UAB Stavaltech was distinguished by impressive project implementations in the construction sector. This included the design of engineering networks in Palanga, the organization of earthworks, the design of residential houses, and successful optimization work in a fish processing plant in Liepaja. In addition, the company performed documentation audit and technical inspection work in the construction of the Kaunas Business Center. The success of the project shows UAB Stavaltech's professionalism and ability to adapt to market challenges.

Autorius

Design and Management of Engineering Networks in "DAGI" Quarter, Palanga

UAB Stavaltech performed important engineering network design and design management works. Engineering field networks designed and building permits obtained for Electricity (LE), Rainwater, Water Supply and Sewerage networks (LVN) for "DAGI" residential block in Palanga, this is just one of the successful projects that the company has successfully implemented.

Land Works "DAGI" Quarter in Palanga

In addition to engineering networks, UAB Stavaltech performed Earthworks permit, construction organization and technical maintenance works. Rain, water supply and sewage (LVN) and electricity (LE) networks were installed in the "DAGI" quarter at Palanga, contributing to the improvement of infrastructure in this area.

Structural design and design management works in Palanga

The company continued its successful work in structural design and design management. The design of the first residential houses in the "DAGI" quarter was an important step towards urban changes in this region. Building permits for construction in Palanga have been obtained.

Optimization Works at "SYFUD" Fish Processing Factory in Liepaja

In Liepaja, on the order of SIA "SYFUD", UAB Stavaltech performed project solution optimization works in the construction of a fish processing plant. Optimization of project solutions was carried out, design inconsistencies were eliminated, optimized and rational solutions for project implementation were presented, project errors were eliminated. Independent tendering of the foundations, metal and reinforced concrete structures, windows, doors and roof structures of the structural part of the construction was carried out, the technical consultations provided helped to achieve estimated savings of 10% to 30% in the construction of the structural part and the well-being installation.

Documentation Audit and Technical Inspection

AB Stavaltech concluded a contract with the general construction company UAB "Litana Construction". It has been agreed to provide documentation audit and technical inspection works in the objects being performed.  

Documentation audit and technical inspection works were carried out in the construction facility of the business center "Merkurijus" in Kaunas, built by the company UAB "Litana Construction".

UAB Stavaltech has proven that challenges can not only be overcome, but also turned into new opportunities. Their projects show that technical know-how and professionalism are key factors for success in this competitive sector. This is a truly impressive achievement for the company, which promises even more exciting projects in the future.

Other news

UAB Stavaltech: Design and construction work completed in 2023!

In 2023, UAB Stavaltech was distinguished by impressive project implementations in the construction sector. This included the design of engineering networks in Palanga, the organization of earthworks, the design of residential houses, and successful optimization work in a fish processing plant in Liepaja. In addition, the company performed documentation audit and technical inspection work in the construction of the Kaunas Business Center. The success of the project shows UAB Stavaltech's professionalism and ability to adapt to market challenges.